看全色黄大色黄大片_伊人网在线免费观看_殴美伊人色综合久久天天_黄页大全免费_亚洲欧美另类激情综合小说_中文字幕有码第一页在线_18禁男女污污污午夜网站免费_精品少妇爆乳无码av网站_99精品国产高清一区二区三区香蕉_欧美在线一二三级

Contact Us

Cross Flow Fan Installation and maintenance requirements

Date: 2016-5-13   Click: 1584 Times

1, "Cross Flow Fan" ambient temperature should be 75ºC ≥ -40ºC.
2, industrial gas through the cooling fan does not allow strong acid, alkali and various solutions.
3, does not allow dust and other debris fall into the fan, so as to avoid burning and fan blades break.
4, "Cross Flow Fan" before installation should first check whether the damage caused due to packing and shipping, deformation, if damaged or deformed should be repaired after installation.
5, and then check the "Cross Flow Fan" all parts and screws are loose; whether touching or displacement between the blade and duct before installation if the touching or the shift should be adjusted. To replace the fan products from different manufacturers, you need to measure fan site size holes.

Back to: Industry news

+86-0769-83660708

Home Product News Contact