看全色黄大色黄大片_伊人网在线免费观看_殴美伊人色综合久久天天_黄页大全免费_亚洲欧美另类激情综合小说_中文字幕有码第一页在线_18禁男女污污污午夜网站免费_精品少妇爆乳无码av网站_99精品国产高清一区二区三区香蕉_欧美在线一二三级

Contact Us

Explosion Inflatable Air Blower installation inspection

Date: 2015-3-31   Click: 1447 Times

Explosion "Inflatable Air Blower" First check the frame, without deformation blades, blade rotation is flexible, with or without friction phenomenon. Check all fasteners are complete, tighten, there should be proof certificate number. Check motor with 500V megger insulation resistance, the resistance value if less than 50MΩ, the short-circuit current application and drying method or drying method, so that "Inflatable Air Blower" insulation resistance greater than 5 MΩ. Connect the power cable diameter should be consistent with the ring, tighten the compression nut should ensure that after the cable between the seals, no gap between the nozzle outlet, otherwise it will lose the proof performance. The assembly should ensure proof gap is less than 0.2mm, replace "Inflatable Air Blower" bearing grease, grease grades for its ZG-2H complex calcium-based Run. When installing, note flameproof surface, when the surface to be coated assembly explosion 204-1 antirust grease. All proof surface may not have damage or corrosion, or they will lose the proof performance, if any damage or corrosion phenomenon according to the "explosion-proof electrical equipment surface defect treatment provisions" repair.

Back to: Industry news

+86-0769-83660708

Home Product News Contact